Master Bath Update

 

This master bath was very spacious, but the floor plan did not make the best use of the space at hand. We took advantage of unused space in order to make it best suit the needs of a vibrant family! We removed the bath tub in order to gain a large shower and separate water closet. We reused all of the existing elements we could. The vanity was painted, with new undermount sinks and countertops. The lighting, faucets and hardware were existing.  Construction by Mckenzie Construction and tile by Zach Rideout of ZR Tile.

 

Leave a Reply